2005 Technical Papers

  

Technical Paper: September 2005 - Oceans 2005 - Cable and Pipeline Burial at 3,000 Meters (494 KB)
Oceans 2005 paper presented September 19 in Washington, DC. Cable and pipeline Burial at 3,000 Meters.
[ download ]

Technical Paper: May 2005 - OTC - Making the Right Connections (1366 KB)
OTC paper presented May 4th. Making All the Right Connections. Addresses the deepwater installation of electrical and hydraulic Flying Leads by Workclass ROV systems.
[ download ]

Technical Paper: February 2005 - Underwater Intervention - Get Inside Robot To Impell Normal Pipe Operation (218 KB)
[ download ]